Thompson of Carlow Thompson of Carlow
  • Home
  • Project Portfolio
    • All Projects
    • Footbridges
    • Road Bridges
    • Gantry Signs
    • Marine
  • About Us
    • Facilities & Equipment
    • Experience
    • Certificates
    • Our History
  • Contact Us
  • Home
  • Structural Steel
    • Structural Steel
    • All Projects
    • Footbridges
    • Gantry Signs
    • Marine
  • Steel Tipper Body
    • Loadmaster
    • 7.5 Tonne Tipper Bodies
    • 3.5 Tonne Tipper Bodies
    • Tipper Grabs
    • Specialist Bodies
  • About Us
    • Our History
    • Structural Steel Facilities
    • Structural Steel – Certificates
  • Contact Us

Leamouth Pedestrian / Cycle Bridge London

Project Summary:

Main Contractor: Sisk

Engineers: O’Connor Sutton Cronin

Turning Mechanism: Rises & Lowers 4m on 4 hydraulic cylinders

Tonnage: 170T

Location: London

Span: 80m

Contract Duration: Ongoing

Completion: November 2014

Similar Projects

Woodhill Rail Overbridge, Tivoli

Bridges, Road Bridges

River Barrow Bridge

Bridges, Road Bridges

Dodder Valley Footbridge

Bridges, Footbridges

Dublin Port Pontoon

Bridges, Marine, Pontoon

Seahill Coastal Walkway

Bridges, Footbridges

Dale Bridge – Denny Scotland

Bridges, Footbridges

Garrycastle N6 Footbridge

Bridges, Footbridges

Lough Lannagh Footbridge

Bridges, Footbridges

Thompson of Carlow

New acre, Athy Rd Carlow Ireland

Phone: (+353) 59 913 1624

Fax: (+353) 59 914 2897

info@thompson.ie

Steel Tippers Division

Structural Steel Division

NHSS-230

 

ISO-9001-230

  • Group Page
  • Structural Steel Division
  • Steel Tipper Body Division

© 2023 Thompson of Carlow - Website Design by Digital Chief