Thompson of Carlow Thompson of Carlow
  • Home
  • Structural Steel
    • Structural Steel
    • All Projects
    • Footbridges
    • Gantry Signs
    • Marine
  • Steel Tipper Body
    • Loadmaster
    • 7.5 Tonne Tipper Bodies
    • 3.5 Tonne Tipper Bodies
    • Tipper Grabs
    • Specialist Bodies
  • About Us
    • Our History
    • Structural Steel Facilities
    • Structural Steel – Certificates
  • Contact Us
  • Home
  • Structural Steel
    • Structural Steel
    • All Projects
    • Footbridges
    • Gantry Signs
    • Marine
  • Steel Tipper Body
    • Loadmaster
    • 7.5 Tonne Tipper Bodies
    • 3.5 Tonne Tipper Bodies
    • Tipper Grabs
    • Specialist Bodies
  • About Us
    • Our History
    • Structural Steel Facilities
    • Structural Steel – Certificates
  • Contact Us

Dublin Port Pontoon

Project Summary:

Client: Dublin Port

Main Contractor: Dublin Port

Engineers: Transmarine

Tonnage: 500t

Span: 120m

Location: Dublin Port

Contract Duration: 12 Months

Completed: 1994

Similar Projects

Woodhill Rail Overbridge, Tivoli

Bridges, Road Bridges

Sheriff Street Bridge

Bridges

Cloongullane Bridge

Bridges

Castlecomer Footbridge

Bridges, Footbridges

Belfast Busway Bridge

Bridges

Salmon Weir Bridge

Bridges

Tramore Valley Bridge

Bridges

Chelmer Waterside Bridge

Bridges

Thompson of Carlow

New acre, Athy Rd Carlow Ireland

Phone: (+353) 59 913 1624

Fax: (+353) 59 914 2897

info@thompson.ie

Steel Tippers Division

Structural Steel Division

NHSS-230

 

ISO-9001-230

  • Group Page
  • Structural Steel Division
  • Steel Tipper Body Division

© 2025 Thompson of Carlow - Website Design by Digital Chief